1980 Greco GOB II 750 Excellent Condition
Go to next photo Go to previous photo
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition
1980 Greco GOB II 750 Excellent Condition

1980 Greco GOB II 750 Excellent Condition

299.00 $
Description
1980 Greco GOB II 750, Excellent Condition. Original retail price ¥75,000. Neck-through construction. Rare original price tag included. All original parts. Original hard case included. Lightly cleaned and in good working order. Almost dead stock condition with only minor scuffs. Bridge has some corrosion. Saddle screws are not seized. Strings are old and should be replaced. Neck has a slight waviness on the 4th string side, typical of neck-through construction. Slight back bow from frets 1-5, and a slight forward bow from fret 5 onwards on the 1st string side. The truss rod turned, but felt like it was affecting the back bow on frets 1-5. Adjusted for balance. String height at 12th fret: 2.5mm on 4th string, 2mm on 1st string.
Details
Category
Base
Condition
No noticeable scratches or marks
Shipping
Included in price (by seller)
From
Tokyo
video
Delivery in 24/48 h

SHIPPINGS

Free shipping in Spanish mainland, Balearic Islands and Portugal.

For other countries the shipping cost will be paid by the client.

DELIVERY TIME (as of delivery)

Spanish mainland, Balearic Islands and Portugal: 1-2 working days.

Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.

Free returns

The return period is 14 calendar days from the receipt of the order.

Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.